Setup Checklist - VR Crane Simulator Motion-Base Station
Make sure you check all the boxes and get started on your ITI VR training journey!
Power
- ☐ Laptop power cable
- ☐ Motion Base power cable
- ☐ Cables plugged into dedicated 110v outlets
- ☐ Touch Controller batteries
Sensors
- ☐ Sensor lenses clean and undamaged
- ☐ (if pre-calibrated) Left / Right sensors identified
- ☐ Sensors securely fastened to tripod
- ☐ Tripod placed approx. 2 ft. (24in.) in front of foot pedals
- ☐ Sensors straight and centered towards operator
Cables
- ☐ USB 3.0 Hub [connect to laptop USB port left side]
- ☐ Sensor cables [connect to laptop USB 3.0 ports right side]
- ☐ Oculus HDMI cable [connect to laptop left side]
- ☐ Oculus USB cable [connect to USB hub left side]
- ☐ Sim USB cable [connect to USB hub left side]
- ☐ HDMI to Mini-Display Port display cable [left side]
VR Headset
- ☐ Cable not showing cuts or other damage
- ☐ Lenses clean
- ☐ Screen displaying properly
- ☐ Confirm no visual lag/latency with movement
Secure Hardware
- ☐ Controller pods securely fastened [not wiggling]
- ☐ Motion Base support arms secure [not wiggling]
- ☐ Cables clear of Motion Base feet [pinch hazard]
- ☐ Left Touch Controller mounted [left side]
Laptop
- ☐ Oculus app running [minimized]
- ☐ Sim configuration selected
- ☐ Controllers functioning in Controller Utility
- ☐ Close unnecessary software [if any]
- ☐ Launch and calibrate simulator!