Skip to content
Industrial Training InternationalJul 9, 2015 9:39:22 AM2 min read

Multi Crane Lifts and Special Look at Tappen Zee (NY) Bridge Project Highlight July Webinar

Multi Crane Lifts and Special Look at Tappen Zee (NY) Bridge Project Highlight July Webinar

Founder of New York City based construction engineering firm Siefert Associates, Vincent A. Siefert, P.E., will be the special guest presenter for the July 2015 Showcase Webinar. Multi Crane Lifts and the New Tappan Zee Bridge will address a number of issues specific to multiple crane lifts with insight based on Mr. Siefert's over 30 years of field experience, as well as the latest standards and regulations from governing bodies and ASME. Specific learning points will include:

  • Typical applications for multi crane lifts
  • What can go wrong
  • Proper procedures to follow
  • Advice for engineers and inspectors on the "Six Most Important Issues"
  • Sample lift plan for new Tappan Zee Bridge

Multi Crane Lifts and the New Tappan Zee Bridge is set for Tuesday, July 28 at 10 AM PDT and 1 PM EDT. As is always the case with ITI's Monthly Showcase Webinar Series, there is no cost to attend. 

The webinar is just a click away... 

Vincent A. Siefert, P.E. started Siefert Associates in June of 2000. Since its inception, the Siefert Team has dedicated themselves to staying at the forefront of their profession and building the organization into the premier construction engineering firm in the Northeast. 

Mr. Siefert is a Professional Civil Engineer with a broad spectrum of experience in both general contracting and construction engineering projects. He has gained his construction savvy through over 30 years of field experience working his way up the ranks from field engineer to general superintendent and project manager on multiple heavy, highway and building projects. He has won the trust and confidence of many major contractors, designers and owners based on his ability to combine his hands on field experience with engineering expertise to help solve their most complex project challenges. 

Mr. Siefert's project highlights include:

  • Reconstruction of all the major East River, Long Island Sound, and Hudson River Bridges
Brooklyn Bridge and Approaches
Manhattan Bridge
Wiliamsburg Bridge
Queensboro Bridge
Triboro Bridge
Whitestone Bridge
Throgs Neck Bridge
George Washington Bridge
Tappan Zee Bridge
New Hudson River Crossing
  • Rebuilding of the World Trade Center
Temporary PATH Station
New Transportation Hub
Vehicle Security Center
Office Towers 1, 3, and 4
Fulton Street Transit Hub
  • Railroad Projects
MTA Metro North New Haven, Harlem, and Hudson Lines, LIRR, Staten Island Railway
MTA Capital Construction East Sie Access Project
NYC Transit 2nd Ave. Subway, 7-line, Vent Plants
AMTRAK Vent Shaft, Sunnyside Yard
  • Marine, Underground, Utility, Power, Water Resource Projects
Howland Hook Terminal
Conoco Phillips Refinery
Wind Turbines, East River Generating Station
North River, Newtown Creek, Bowery Bay WPC Plants
Cat Del UV Plant
  • Building Projects, Educational Facilities
11 Times Square
Singapore Chancery
PA Bus Terminal
Columbia University Expansion
Rensselar Empac Center
SUNY Albany


avatar

Industrial Training International

Cranes | Rigging | Lift Planning | Engineering | VR Simulation

COMMENTS

RELATED ARTICLES